Fasano Hotel and Residences Shore Club Condos for Sale
The new Fasano Hotel & Residences Shore Club Miami Beach has begun the redesign and new construction for the newly imagined Fasano Shore Club Miami Beach. Located at the well known original Shore Club Miami Beach location.
The NEW Fasano Hotel & Residences Shore Club Miami Beach Details
- North Tower: 8-stories with 27 condominium residences
- Center Tower: 20-stories with 43 condominium residences Bungalows (approx. 5 units – 2 levels, with full kitchens and bathrooms – perfect Pied-a-terre)
- South Tower: 5-star hotel only with 100 hotel rooms
The 3-acre oceanfront location boasts a long history of many celebrity sightings, poolfront parties and celebrity chef restaurants, along with its famously photographed infinity-edge beachfront pool, rooftop spa, and direct beach access, will be transformed into approximately 75 one, two and three-bedroom luxury condominium residences.
With a newly renovated stand-alone 5-star Fasano hotel, offering 100 oceanfront hotel rooms. Many of the newly designed Fasano Shore Club Miami Beach condominium residences feature large outdoor living space and terraces. The majority of the existing properties redesign is being done on the Center Tower. With only 43 residences on 20-stories, it appears that many floors will offer no more than 2 or 3 luxury residences per floor, with the possibility of a few full floor condominium residences and/or penthouse homes available.
First renderings of the new Miami Beach Shore Club condos show lots of floor-to-ceiling glass, high ceilings and much more. The new larger outdoor living spaces and expansive terraces are very notable in the artist renderings of the center tower.
Fasano Miami Beach Shore Club condominium preconstruction pricing is starting at nearly $2m to over $6m. With prices per square foot starting at just over $1,800 per square foot to $3,900 per square foot*.
*prices and price ranges can change without notice
Beginning of the limited tear down and total redesign and build of the 3 building property began in mid 2015. With completion of the construction and delivery of residences projected for two years after the beginning of construction (approximately summer 2017).